Optimisation Services for Fair Park 62MW Solar PV Generation and 50MW / 2h battery storage Plant – Downing

Project: Design Optimisation of co-located asset.

Work: Mammoth’s Team was required to optimise the utilisation of a specific land plot, maximise the installed Solar PV capacity and the yield. The teams was also asked to size and design a collocated energy storage battery plant in order to better utilise the connection and its export constraints. The site was a complex site split in two parts which required numerous iterations and complete redesign due to specific characteristics, shading, flora and public access paths.

Result: The team produced a full set of drawing for Planning purposes and modelled the site in PVSyst and PVCase producing variations of generation models.