Winston Farm Hybrid Solar and Storage Project

Project:

Design Optimisation and Construction Management of a 1.1MW Solar + Storage Hybrid Project

Work:

Mammoth Energy’s team was responsible for a comprehensive range of services, including design optimisation and as-built designs, tender and procurement management, bill of materials, and construction oversight. The project involved the sizing and yield assessment of both the solar and storage components, ensuring maximum efficiency of the hybrid system. The team also produced detailed production reports and performed continuous yield assessments to ensure optimal performance.

Result:

The project successfully achieved its targeted performance metrics, with a fully optimised hybrid solar and storage system of 1.1MW. The team provided regular production reports, ensuring that the system operates at peak efficiency while adhering to project timelines and budget constraints.

 